The best way to Create a Closet to be Lowered by a Header

A header is beam or a board that runs above an open span in-wall framing. The header is employed to carry the the strain of the upper-floor or roof on the other side of the span. Closets are framed so that their doorway opening is in line with with other doorways in the house. In a few instances a builder could have have gone the closet open from floor to ceiling. Some folks who purchase a house with this particular type of closet choose to include closet doors to to cover up their possessions. To include a do-or you need to first include header and a doorway. This lowers the closet opening.

Place plastic sheeting on the ground in your doorway. Remove the baseboard. Use claw hammer and a pry-bar. Cut-away a rectangle 1 1/2 inches wide by 3 1/2 inches long with the size devoted to the wall thickness. for those who have carpet Remove any tackstrip in the same little region and the padding. Repeat for the 2nd side.

Measure the width of the opening. Cut a two-by-four to this size. Place the board together with the flat side from the ceiling. Nail the board to the ceiling plate which is hidden beneath the ceiling dry wall. Use framing nails, one every 8″.

Cut two pieces of 2-by-4 inch board 82 5/8 uncovered sub floor beneath your carpet inches if you’ve Cut to 82 inches for those who have hardwood floors. These boards are jack studs, which are utilized to to guide your header. Place one jack centered and stud vertical. Check for level. Use wood shims involving the board to create the level as well as the drywall. Nail every 8 to one foot and the stud to the concealed stud supporting the drywall nail a T each shim.

Place your jack stud opposite that is 2nd on the next door opening. Measure involving the within faces of your jack studs. Figure out what what dimension you are going to need for the proper width of tough opening in the event that you intend to to hold a pre-hung do-or in your opening. Door suppliers offer on the web requirements sheets for his or her doors. These sheets list the tough openings of every door size. Eliminate extra carpet and padding in case your present jack stud placement is also extensive and a-DD scrap lumber between the jack stud as well as the concealed stud behind your dry wall to attain the proper tough-in width. Use wood shims to keep the jack stud and nail the jack stud to the concealed stud or to the blocking.

Cut two pieces of 2-by-6 inch board and a piece of OF JUST ONE/2 inch plywood of the same dimension, utilizing your width measurement. Sandwich the plywood involving the boards and nail them together to to create a header. Place the header together with the jack studs and toe-nail the header to the wall studs that are concealed utilizing a T least four nails on each and every end. The THE TWO-by-6 inch boards will lie on their slim sides.

Measure involving the underside as well as the header . Cut a two-by-four for every 16-inches of the header duration. Position these boards every 16-inches oncenter, straight and vertical. The cripple studs in to location utilizing two framing nails. The brief studs above a header are called studs.

See related